Step 1-Installing the AC branch circuit junction box
ACheck and make sure the AC voltage is within the voltage range indicated on the label.
BMount the Meikai adapter plate at a suitable location on the PV racking system (typically at the
end of a branch of modules).
CConnect the open wire end of the AC interconnect cable into the junction box using an
appropriate gland or strain relief fitting.
DWork out the total current basis on the number of micro-inverters in each branch, use an
appropriate cable and connect the AC branch circuit junction box to the point of utility
interconnection.